ClientLOMA DE NIQUEL ABB MINING
IndustryNickel
LocationTiara
StateAragua
CountryVenezuela
Man Hours243.200

Intervened Equipment

  • Two (02) Rotary Kilns 120 meters long and 5.2 meters in diameter
  • Two (02) Submerged Arc Furnaces of 6 meters. high and 14 meters in diameter.
  • Fireplaces, Load Hoppers, Sangria Channels and Discharge Mouths

Scope of Service

Installation of 6,500 Tons of Refractory Material.

en_USEnglish